Homepage   |   Power Generation   |   Top Spare parts   |   spare parts   |   China OEM Equipment and Spare Parts   |   Project Financing    |   Equipments   |   China Small EPC Contractor   |   Transmission   |   Financing-Ebook   |   Contact Us   |   Used Equipment   |   download   |   sitemaps   |   Project-Equipment-Parts-Enquiry   |   供货商Supplier   |   Exchange Link   |   Breaking News  

Mail List

E-mail:

Home > China Small EPC Contractor - EPC quotation on DEUTZ BV16M640 used power plant project


Google

EPC quotation on DEUTZ BV16M640 used power plant project

 

For the 11 units of used Deutz hfo power plant project, roughly quotation is as:

Item

Description

1

11 units of DEUTZBV16M640 HFO Genset, second hand(origin: Germany)

2

Services on 11units of DEUTZBV16M640 HFO Engine: dismantle of themain engine and its auxiliaries, inspection, cleaning, refurbishing, replacement of damaged parts, special tools for inspection and repair. Guaranteeing that each engine can run 10 years with output of 5000kw. Loading to the ships for sea transportation.

3

Services on 11 units of alternator: dismantling, cleaning, and painting.  Loading to the ships for sea transportation.

4

Services on the distribution system of the alternator: inspection, cleaning, replacing damaged parts.  Services on the pumps: dismantling, inspection, cleaning, replacing damaged parts. special tools, packing and loading to ship.

5

Dismantling, replacing of pipes and cables, all the installation accessories such as flanges, nuts, valves. Packing and loading to ship.

If the layout is different from the current used power plant, then pipes and cables should be re-purchased at additional costs from the employer.

6

Site installation, commissioning, installation tools. 2 months warranty period.

7

1. One unit of emergency generator set needed, 2 units of standard 400Vtransformer, 24V and 110V charging panels and related cables, supports should be needed

1.      Eleven (11) units of DEUTZBV16M640 used power plant. Not including: tax, tariffs, sea transportation. So we can define the above quoted as EXW China port.

2.       All the international travelling, boarding and meals, insurance, medical, security, visa should be responsibility of the employer. Air conditioning rooms should be provided. And also employer should provide crane and fork lifts and other heavy machine for installation/commissioning.

Equipment inside the power plant(EXW China), installation/commissioning:

Other items (scope) should be defined after design and site survey and them to be quoted (refer to attached)





Statement: Any reference to the OEM, part number or other OEM information is for the purpose of identification only and does not imply that the part was manufactured by the Original Equipment Manufacturer.

All the brands and trademarks in the whole domain of the website belong to their own owners and does not mean that we are their authorized partner or dealer. All the information in this website is only for reference, we do not assure its accuracy.

This statement supersedes all other claims and statements on all pages, files, pics and information within this whole web domain.
Copyright©2006-2019 Leda Greenpower Beijing ICP Reg. No: 10010978.   Fax:0086-10-84161062  E-mail:
[email protected] [email protected]